I have to create multiple counter plan. I have created cycle set for every 20k miles and every 12 month. What should be next?
Creating a Multiple Counter Plan :
Choose Logistics -> Plant Maintenance -> Preventive Maintenance -> Maintenance
Planning -> Maintenance Plans -> Create -> Multiple Counter Plan.
You reach the initial screen for creating a maintenance plan.
- Enter the necessary data:
- Enter a maintenance plan category.
A maintenance plan category which generates service entry sheets for
the due date, is not advisable for a multiple counter plan because the
system would generate the same service entry sheet for each due date.
If you want to create the maintenance plan with a copy model for maintenance
cycles, you enter a cycle set.
- Choose .
You reach the initial screen for creating a multiple counter plan.
Enter the necessary data for the maintenance plan header and create new
maintenance cycles on the tabstrip Maintenance plan cycles or change/delete
existing cycles if you have created the multiple counter plan with a cycle
set as copy model.
- Enter the necessary data for the maintenance item.
Assign a task list to the maintenance item:
- To assign an existing task list, choose.
- To create a task list, choose with quick info Create Task List/
General Task List. Assign maintenance packages to the operations of the
task list.
After you have assigned a task list, the system displays the following
data:
- The assigned task list on the Item tab page.
- The maintenance packages from the strategy assigned to the
operations in the task list on the Maintenance Plan: Cycles tab page.
- Assign further technical objects to the maintenance item if
necessary using the Object list (see Object List) tab page.
If you want to create further maintenance items, choose with
quick info Create MaintItem.
- Enter the necessary data, or select an unassigned maintenance item
using .
- Assign a task list if necessary to each of the maintenance items.
- Assign other technical objects if necessary to the maintenance item.
In order to cancel the assignment of a maintenance item to the maintenance
plan, choose.
- Maintain the scheduling parameters if necessary on the Maintenance
Plan Scheduling Parameters tab page.
- Save the maintenance plan.
Then you shuold begin to input the measurement document.
I assume that you have created tasklists which you've attached inserted into the Maintenance Plan that you created and I also assume that you've picked the link to be either AND or OR.
Once those things are done, your deadline monitoring will of course begin to call the ORDERs or any other call object that you specified at the Maintenance Plan category.
By :Olaoluwa Aaron Fapohunda
SAP Reference Books :-
SAP PM, CO, FI, PP, SD, MM, PS,
QM, SM, HR, BW, APO, Basis, ABAP/4, Certification, Books
Back to SAP PM :-
SAP PM (Plant Maintenance) Hints
and Tips
Return to :-
SAP ABAP/4 Programming, Basis
Administration, Configuration Hints and Tips
(c) www.sap-basis-abap.com All material on this site is
Copyright.
Every effort is made to ensure the content integrity.
Information used on this site is at your own risk.
All product names are trademarks of their respective
companies. The site www.sap-basis-abap.com is in no way affiliated
with SAP AG.
Any unauthorised copying or mirroring is prohibited.