| Discrete Manufacturing Flow
By Tcodes - A.Shankar
Discrete mfg can be Make to stock / Make to order.
1) Make to stock :
Master datas :
Material master - MM01 - Strategy group - 10 lot
- ex
BoM - CS01
Routing - CA01
Wrk Centre - CR01
Creation of PIR - MD61
MRP RUN :- MD02 / MDBT in background
MD04 - STOCK LIST
CO41 - Conversion of planned orders to production
orders
CO05n - Release prodn orders
CO11N - Operation wise confirmation Co15 - Header
level confirmation.
MB31 - GR - assign auto gr thru control key.
COHV - Mass techo the completed orders
Co88 / Ko88 - Settling the prodn orders.
2) Make to order :
Master data is the same in material master maintain
statergy as 20
Create a sale order - VA01
Run mrp - MD50 for sale order / md02 for material
MD04 - Stk requirement list
Rest all steps are same as mentioned for make to
stock.
SAP Reference Books:
SAP PP, CO, FI, PM, SD, MM, PS,
QM, SM, HR, BW, APO, Basis, ABAP/4, Certification, Books
Back to:
SAP PP (Production Planning) Configuration
Hints and Tips
Return to :-
SAP ABAP/4 Programming, Basis
Administration, Configuration Hints and Tips
(c) www.sap-basis-abap.com All material on this site is
Copyright.
Every effort is made to ensure the content integrity.
Information used on this site is at your own risk.
All product names are trademarks of their respective
companies. The site www.sap-basis-abap.com is in no way affiliated
with SAP AG.
Any unauthorised copying or mirroring is prohibited.
|