| PP Integration with FI , SD,
MM and QM
What PP topics are related for integration with FI, SD, MM and QM?
Integration of PP with other modules:
PP-MM integration
Material Type: Allow material type in BOM / routing.
Batches: Batch search sorting.
MRP: PD or CBP mrp planning.
PP-QM
Inspection lot generation as production order is released.
When GR is made, material posting to inspection stock.
Assignment of inspection characteristics in routing.
Assigning inspection work center in operation for the purpose of scheduling.
PP-SD
Can have Sales order BOM.
MRP run against sales order.
Availability check for sale order.
Requirement class creation for customer requirement in Basic Function
(Transfer of requirement).
PP-FICO
GL entry.
Cost element entry.
Production order cost in order creation n release.
Accounting document posting to Profit Center.
Product costing.
Settlement profile allocation to order type.
Work center assignment to cost center.
Activity type assignment.
Production order settlement.
SAP PP Reference Books:
SAP Production
Planning , Configuration, Interview Questions and Certification, Books
Goto:
SAP MRP - Materials Requirements
Planning Configuration Hints and Tips
Back to:
SAP PP (Production Planning) Configuration
Hints and Tips
Return to :-
SAP ABAP/4 Programming, Basis
Administration, Configuration Hints and Tips
(c) www.sap-basis-abap.com All material on this site is
Copyright.
Every effort is made to ensure the content integrity.
Information used on this site is at your own risk.
All product names are trademarks of their respective
companies. The site www.sap-basis-abap.com is in no way affiliated
with SAP AG.
Any unauthorised copying or mirroring is prohibited.
|