Use the program RIACCESS. It's a PM program. You need to parameter a RFC.
Look at OSS Notes using "RIACCESS".
Note : Date variable are created with a lengh equal to 10 (External length), as well as the Time variable.
Other than the DATS and TIME variable, you'll get a perfect structure.
Return to :-
SAP ABAP/4 Programming, Basis Administration,
Configuration Hints and Tips
(c) www.sap-basis-abap.com All material on this site is
Copyright.
Every effort is made to ensure the content integrity.
Information used on this site is at your own risk.
All product names are trademarks of their respective
companies. The site www.sap-basis-abap.com is in no way affiliated
with SAP AG.
Any unauthorised copying or mirroring is prohibited.