During the sap capacity planning, you can choose whether planned or producton order are consider during capacity planning.
The transaction code used is OPA2 - Selection Profile Name SAPA010.
The Production Order controls whether the production order is included in the capacity planning. In OPU3 - Specify Scheduling Parameters, if you tick the Generate Capacity Requirements, all production order created with the Order Type will be included in capacity planning.
If the plan order didn't appear in some work center check :-
OPU5 - Scheduling Type - e.g. Backwards
- Assign a approciate Scheduling Type
OPPQ - BOM/Routing Selection -
e.g. BOM select.ID 01 Rtg select.ID
01
Return to :-
SAP ABAP/4 Programming, Basis Administration,
Configuration Hints and Tips
(c) www.sap-basis-abap.com All material on this site is
Copyright.
Every effort is made to ensure the content integrity.
Information used on this site is at your own risk.
All product names are trademarks of their respective
companies. The site www.sap-basis-abap.com is in no way affiliated
with SAP AG.
Any unauthorised copying or mirroring is prohibited.