Normally, the planned order determined the date from Material Master. The Planned Order created by the MRP reads the production capacity requirement from Material Master. (MM03 – Work Scheduling – Lot size dependent in-house production time). When you convert the planned order to a production order, SAP determined the date from Routing.
User Requirements:- Planned and Production Order should read the requirement from routing.
Solutions:-
Run MRP Scheduling -> 2 – Lead time scheduling and capacity planning
Transaction OPA9 (Sel. Profile - SAPA010) - Change configuration for Capacity Planning to read Production Order. Untick the Planned orders under the Order categories.
Return to :-
SAP ABAP/4 Programming, Basis Administration,
Configuration Hints and Tips
(c) www.sap-basis-abap.com All material on this site is
Copyright.
Every effort is made to ensure the content integrity.
Information used on this site is at your own risk.
All product names are trademarks of their respective
companies. The site www.sap-basis-abap.com is in no way affiliated
with SAP AG.
Any unauthorised copying or mirroring is prohibited.