Element MatSub in the MRP Requirement (MD04) is calculated wrongly. Apply note 121238. Run the OSS note program ZZSUBC40 once and the problems is solved. In the new version, stocks are tied to the Vendor.
If you want the old logic (3.0x), you can apply note 170597 and the planning will not check for Vendor.
Return to :-
SAP ABAP/4 Programming, Basis Administration,
Configuration Hints and Tips
(c) www.sap-basis-abap.com All material on this site is
Copyright.
Every effort is made to ensure the content integrity.
Information used on this site is at your own risk.
All product names are trademarks of their respective
companies. The site www.sap-basis-abap.com is in no way affiliated
with SAP AG.
Any unauthorised copying or mirroring is prohibited.